Skip to assembly instructions
MadMoxxModels

GachaPak / Customer setup

A few steps.
Then it’s pack time.

Your GachaPak arrives partly assembled. Start here to finish the hopper and enclosure, test it, and load your items.

These are steps 27–33 from the assembly guide. The original numbers and diagrams are kept so everything lines up.

Before you start

Put these within reach.

The supplied parts should match the version of GachaPak you ordered.

Step 27

Fit the hopper

Remove any breakaway supports from the hopper spring tabs. Lower the hopper onto the same alignment pins as the track. Secure it with 4 standard screws in the threaded holes. The hopper holds the track down.

Next: step 28
Hopper lowered onto the alignment pins above the track, with four screws around its base.Tap diagram to enlarge

Step 28 / Optional

Prepare the follower weight

Optional. Recommended for sticker sleeves and top loaders without bumper.

If using the follower weight, fill its box with sand or steel bearing balls. Seat the lid flush and fit 4 standard screws.

Next: step 29
Follower weight box with its lid lifted to show the four corner screw holes.Tap diagram to enlarge

Step 29

Test before fitting the panels

Stack a few items flat in the hopper, just as you plan to vend them. If using a follower weight, set it on top. Insert a token and turn the handle.

Check the vend: One item should exit and the pusher should return. If it catches, check the wheel arrows, pusher pin, and track alignment before continuing. If you need help with those checks, contact Moxx.

Need help with the test vend? Email MoxxNext: step 30
GachaPak base with the hopper fitted and the enclosure still open for the test vend.Tap diagram to enlarge

Step 30

Install the four uprights

Match A and B on the four uprights to the letters on their corner sockets. Thread each upright in until the panel grooves line up. Matching letters sit diagonally across from each other.

Next: step 31
Four upright posts positioned over the matching corner sockets around the hopper.Tap diagram to enlarge

Step 31

Fit the front and side panels

Slide the slotted front panel into the grooves above the coin mechanism. Install two blank side panels. Seat the bottom edges fully in their grooves. Leave the back open for loading.

Next: step 32
Front panel with a dispensing slot and two side panels sliding into the upright grooves; the back remains open.Tap diagram to enlarge

Step 32

Load your items and close the back

Stack your items flat in the hopper through the open back. If using the follower weight, set it on top. Slide the third blank panel into place.

Next: step 33
View through the open back showing items stacked flat inside the hopper before the final panel is inserted.Tap diagram to enlarge

Step 33

Secure the lid

Nest the lid on all four uprights. Secure the corners with 4 lid screws. Stop once each is snug.

Finish setup
Lid resting above all four uprights with one lid screw at each corner.Tap diagram to enlarge

Ready to vend

Load it. Token in. Let them pick.

Keep this page handy for your next setup. If something doesn’t line up or the test vend catches, send me a photo and tell me which GachaPak version you have.

Diagrams and assembly sequence from the supplied GachaPak assembly guide.